sorry i was tired
to be continue...
| BATTERY NodeB 3900A |
| Combiner HUAWEI |
| PDU (Power Distribution Unit) |
| RTN (IDU) RTN Coaxial Cable connect from Slot ISU to Port ODU on top Tower |
| Combiner Installation Vertical |
| NodeB (right) and Battery (left) |
| NodeB (left) and Battery (right) |
THANKS
ReplyDelete